Faculty of Built Environment and Engineering
2010 SERF field trips
| Field Trip Exercise | Class | Co-ordinator | Faculty |
|---|---|---|---|
| Students collecting information to input into a hypothetical design of a residential development | ENB40–ENB378 | Les Dawes | BEE |
| Students are collecting and surveying site information to input into a hypothetical design of a culvert across creek | ENB40–ENB378 | Les Dawes | BEE |
| Renovation work on the Barracks | UBD214 | Paul Den Ronden | BEE |
| Students undertaking high accuracy survey marks on edges of SERF property and staff set equipment all day | UBD384 | Robert Webb | BEE |
| Samford Glasshouses precinct - Integrated master plan for potential additional field site | UDP40 | Paul Donahue | BEE |
2009 SERF field trips
| Field Trip Exercise | Class | Co-ordinator | Faculty |
|---|---|---|---|
| Field Survey practice of the property boundaries- mostly the road reserves and side fences/ survey pegs etc | UDB486, Cadastral Practice | Robert Webb | BEE |
| Students are collecting site information to input into a hypothetical design of a residential development. We will be walking around the site pointing out important issues | ENB274, Design of Environmental Sustainable Systems | Les Dawes | BEE |
| Repair and upgrade the Barracks building while keeping its 'rustic' atmosphere | UDB214, Professional Studies 2 | Paul Den Ronden | BEE |
2008 SERF field trips
| Field Trip Exercise | Class | Co-ordinator | Faculty |
|---|---|---|---|
| Students concept designing access roadway and parking area at the SERF. Students need to inspect site and take measurements and ground truth data | CEB411, Thesis Project A | Jonathan Bunker | BEE |
| Site planning field observation to investigate characteristics of the SERF and propose plans for its future use | UDB266, Planning Processes and Consultations UDB265, Site Planning |
Tan Yigitcanlar Phil Heywood |
BEE |
| Collecting site information to input into a hypothetical design of a residential development. No disturbance other than digging 2 small holes for soil samples | EN40 | Les Dawes | BEE |
| Land survey measurement techniques to place GALV. Star pickets at 100metre intervals. Part of a larger spatial infrastructure project at the SERF | PSB645, Surveying and Mapping Practice | Robert Webb Jim Smith |
BEE |
| Repair and upgrade the Barracks building while keeping its 'rustic' atmosphere | UDB214, Professional Studies 2 | Paul Den Ronden | BEE |

